Acid Rock Drainage Transfer System for The Gilt Edge Mine

Venue

Campus Center - Ross

Field of Study

Civil Engineering

Abstract

This presentation will be reviewing the engineering processes used to successfully design improvements to the pumping station in Hoodoo Gulch at the Gilt Edge mine. This new system will include a change in the current pumping system and a new pipeline. These changes will reroute the current discharge location from the Sunday Pit on site to the Stormwater pond where it can be stored before treatment. These changes will allow cleanup at the site to be continued according to the official Record of Decisions.

Start Date

25-4-2019 10:00 AM

End Date

25-4-2019 10:15 AM

Share

COinS
 
Apr 25th, 10:00 AM Apr 25th, 10:15 AM

Acid Rock Drainage Transfer System for The Gilt Edge Mine

Campus Center - Ross

This presentation will be reviewing the engineering processes used to successfully design improvements to the pumping station in Hoodoo Gulch at the Gilt Edge mine. This new system will include a change in the current pumping system and a new pipeline. These changes will reroute the current discharge location from the Sunday Pit on site to the Stormwater pond where it can be stored before treatment. These changes will allow cleanup at the site to be continued according to the official Record of Decisions.